Case Studies

When hygene is critical there is no room for compromise.
Give yourself peace of mind and get the best defence against the spreading of
micro-organisms and cross infections.

Case Studies

image 1 image 2 image 3

Croydon Hilton Hotel


•   On behalf of Red Squared Food Service and Laundry Solutions.
•   Comprised of removing 3 large Tumble Dryers and one 3m long Roller Iron through side door on the first floor
•   Upgrade to existing gas, ducting and electrical services
•   All new equipment 2 X T4900 and 1 x IC4 4832 craned in through side of building
•   3 days work




image 1 image 2 image 3

Sway Place


•  On behalf of HCE Food Service Equipment
•   New build Nursing Home in Sway Limington
•   Installation of machines 1 x W4105H 2 x W4240H 2 x T4530G tumble dryers 1 x IB4 3320
•   We supplied and fitted all new waste pipe work, ducting for tumble dryer and connected into the existing gas supply
•   All machines were lowered down through the stairwell and the tumble dryers were laid over on their side so that
    they would fit through the stairwell
•   4 days work

commercial washing machine | commercial tumble dryer | commercial tumble dryers | washer extractor | washer extractors

Seo | Jigsaw Design Studio