• On behalf of Red Squared Food Service and Laundry Solutions.
• Comprised of removing 3 large Tumble Dryers and one 3m long Roller Iron through side door on the first floor
• Upgrade to existing gas, ducting and electrical services
• All new equipment 2 X T4900 and 1 x IC4 4832 craned in through side of building
• 3 days work
• On behalf of HCE Food Service Equipment
• New build Nursing Home in Sway Limington
• Installation of machines 1 x W4105H 2 x W4240H 2 x T4530G tumble dryers 1 x IB4 3320
• We supplied and fitted all new waste pipe work, ducting for tumble dryer and connected into the existing gas supply
• All machines were lowered down through the stairwell and the tumble dryers were laid over on their side so that
they would fit through the stairwell
• 4 days work